Research Article

Multi-Objective Stochastic Synchronous Timetable Optimization Model Based on a Chance-Constrained Programming Method Combined with Augmented Epsilon Constraint Algorithm

Figure 6

Sensitivity analysis of parameter K. (a) D takes the minimum. (b) takes the minimum.
(a)
(b)