Research Article

Mathematical Problems in Engineering Landscape Ecological Security Assessment and Ecological Pattern Optimization of Inland River Basins in Arid Regions: A Case Study in Tarim River Basin

Table 2

The ratio of each ecological risk level in TRB in four periods.

Risk levelArea/km2Change ratio/%
19902000201020201990–20002000–20102010–2020

Low risk105490.74102003.2896890.4285162.72−3.42−5.28−13.77
Relatively low risk153342.37151718.48142635.10144424.86−1.07−6.371.24
Medium risk204713.05206221.62180941.32192709.240.73−13.976.11
Relatively high risk231268.06229987.72229288.61233568.51−0.56−0.301.83
Hight risk338523.99343407.11383582.75377472.881.4210.47−1.62