Research Article
Economic Analysis of Incremental Distribution Network Construction of Urban Industrial Park under the Background of Smart City
Table 6
2016 overall plan for replacement of power grid equipment in a certain area.
| Equipment | Possible replacement percentage of equipment (%) | Replacement plan |
| Electric cable | 3.63 | Replace 2 cables over 20 years | Switchgear | 0.03 | No replacement plan | Distribution transformer | 20.54 | Replace 6 sets of distribution transformers over 10 years | Main transformer | 0.01 | No replacement plan |
|
|