Research Article

Effects of Solar Photovoltaic Penetration on the Behavior of Grid-Connected Loads

Table 3

Load of Al Bashir primary substation and distribution transformer-52 in 2018 and 2019.

Al Bashir 11 kV feeder-1Distribution transformer-52, 1000 kVA

Month2018—average kW2019—average kW2018—average kW2019—average kW
January9501000271285
February9601000274285
March15001627428463.6
April18002200513627
May25002391713384.3
June30002777852380.8
July31002655884427.5
August32002815912520
September28002356798342.2
October20001605570168.8