Research Article
Simplified Calculation of Lateral Displacement of a Cement-Soil Gravity Retaining Wall
Table 2
Comparison of measured values and theoretically calculated values of each engineering case.
| No. | Project name | Wall length/m | Wall width/m | Excavation depth/m | Lateral displacement of wall top/mm | Error/% | Calculating results | Measured data |
| 1 | Foundation pit in Hou et al. (2014) [11] | 13.5 | 4.7 | 5.65 | 82.3 | 71 | 15.9 | 2 | Kangji building in Chen et al. (1997) [12] | 12.0 | 4.2 | 5.95 | 40.6 | 35 | 16.0 | 3 | Water company in Ding et al. (2005) [13] | 15.3 | 3.7 | 6.3 | 33.1 | 24 | 9.1 | 4 | Foundation pit in Gong (2008) [10] | 9.2 | 3.2 | 4.8 | 29.4 | 26 | 13.1 | 5 | Port authority building in Li et al. (1998) [14] | 9.0 | 3.2 | 5 | 35.7 | 40 | 10.75 | 6 | Foundation pit in Xiong (2003) [15] | 13.3 | 5.3 | 6.2 | 96.2 | 82 | 17.3 |
|
|