Research Article
Two-Stage Hybrid Optimization Algorithm for Silicon Single Crystal Batch Scheduling Problem under Fuzzy Processing Time
Table 1
Corresponding production type representation.
| The type of silicon single crystal | The type of single crystal furnace | 22 inch | 24 inch | 28 inch | 32 inch |
| 6 inch | Yes | Yes | No | No | 8 inch | Yes | Yes | Yes | No | 10 inch | Yes | Yes | Yes | No | 12 inch | No | No | Yes | Yes |
|
|