Two-Stage Hybrid Optimization Algorithm for Silicon Single Crystal Batch Scheduling Problem under Fuzzy Processing Time

Table 2

Symbol definition.

SymbolExpression

Number of machines
Number of jobs
Dimension type
Maximum of production batch
Dimension sequence
Machine sequence
Job sequence
Production batch
Machine type
Loading capacity of the -th machine
The order quantity of the -th size order silicon single crystal
Actual production quantity of the -th size order silicon single crystal
The -th job is operated on the -th machine
The number of the -th size silicon single crystal grown on the -th machine
Fuzzy processing time of the -th size silicon single crystal on the -th machine
Fuzzy completion time of the -th size silicon single crystal order
Fuzzy maximum completion time
Fuzzy starting time of the -th size silicon single crystal in -batch on the -th machine
Fuzzy completion time of the -th size silicon single crystal in -batch on the -th machine