Research Article
Two-Stage Hybrid Optimization Algorithm for Silicon Single Crystal Batch Scheduling Problem under Fuzzy Processing Time
Table 6
The allocation results obtained by the manual scheduling.
| Silicon single crystal rod size | Thermal fields’ size | Actual production quantity (kg) | Order quantity (kg) | 22 inch | 24 inch | 28 inch | 32 inch |
| 6 inch | 0 | 14 | — | — | 2100 | 2000 | 8 inch | 0 | 0 | 13 | — | 3250 | 3200 | 10 inch | 0 | 0 | 4 | — | 1000 | 910 | 12 inch | — | — | 0 | 7 | 2800 | 2778 |
|
|