Research Article
Two-Stage Hybrid Optimization Algorithm for Silicon Single Crystal Batch Scheduling Problem under Fuzzy Processing Time
Table 8
The production batch allocation results obtained by the manual scheduling.
| Silicon single crystal furnace size | Device ID | The first batch | The second batch | The third batch | The fourth batch |
| 22-inch thermal field | | — | — | — | — | | — | — | — | — | | — | — | — | — | | — | — | — | — | | — | — | — | — |
| 24-inch thermal field | | 1 | 1 | 1 | — | | 1 | 1 | 1 | — | | 1 | 1 | 1 | — | | 1 | 1 | 1 | — | | 1 | 1 | — | — |
| 28-inch thermal field | | 1 | 2 | 1 | — | | 1 | 2 | 2 | — | | 1 | 1 | 1 | 1 | | 1 | 1 | 1 | 1 | | 1 | 2 | 1 | — |
| 32-inch thermal field | | 4 | 4 | — | — | | 4 | 4 | — | — | | 4 | — | — | — | | 4 | — | — | — | | 4 | — | — | — |
|
|