Research Article
Horizontal Cooperation in Subcontracting: A Case Study in Home Textile Industry
Table 7
Subcontractor selection among CA’s subcontractors in order to meet the demand of CB.
| Candidate subcontractor for CB | Distance to CB for each subcontractor (X) | Fabric production capacity (Y) | Subcontractor selection criterion (Z = X/Y) |
| S 1 | 6 | 150 | 0.040 | S 3 | 10 | 150 | 0.066 | S 4 | 9 | 450 | 0.020 | Minimum rate | 0.020 |
|
|