Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Figure 3

The frequency histogram and kernel density estimation of wind (a) and PV (b) power output. The cumulative probability distribution of wind (c) and PV (d) power output.
(a)
(b)
(c)
(d)