Research Article
Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints
Figure 3
The frequency histogram and kernel density estimation of wind (a) and PV (b) power output. The cumulative probability distribution of wind (c) and PV (d) power output.
(a) |
(b) |
(c) |
(d) |