Research Article
Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints
Figure 8
Comparison of predicted and actual storage capacity of Hongjia Du (a), Dongfeng (b), Wujiang Du (c), and Goupitan (d) hydropower stations by time.
(a) |
(b) |
(c) |
(d) |