Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Figure 8

Comparison of predicted and actual storage capacity of Hongjia Du (a), Dongfeng (b), Wujiang Du (c), and Goupitan (d) hydropower stations by time.
(a)
(b)
(c)
(d)