Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Table 1

Essential information of hydropower stations in Guizhou section of the Wu River.

StationsDead water level (m)Normal water level (m)Installed capacity (MW)Hydropower generation coefficientRegulatory capacity (108 m3)

HJD1076.001140.00600833.61
DF936.00970.006958.354.90
SFY822.00837.006008.30.67
WJD720.00760.001280813.60
GPT590.00630.0030008.529.02
SL431.00440.0010508.53.17
ST353.50365.0011208.52.87