Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Table 4

Power generation statistics before and after hydro-wind-photovoltaic complementarity in wet years.

 Hydro powerWind powerPV powerAbandoned powerDelivery powerAbandoned water

Before281.0049.2834.3517.98346.650
After278.5049.2834.350362.130