Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Table 7

Comparison of optimal scheduling and simulated scheduling of electricity for hydro-wind-photovoltaic complementarity.

 HJDDFSFYWJDGPTSLSTSummary

Optimal scheduling103.76115.5280.02175.32417.02198.77248.161338.57
Simulated scheduling113.43124.7882.07185.51430.60198.84245.061380.29
Relative errors (%)9.328.022.565.813.260.041.253.12