Research Article

Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints

Table 8

Error analysis index values for simulation scheduling results.

ItemsMAERMSEMAPER2

Capacity of HJD12751.8816843.513.94%0.9623
Capacity of DF1310.262754.832.64%0.9818
Capacity of WJD3333.376753.972.05%0.9658
Capacity of GPT4693.1413994.890.94%0.5086
Output of HJD51.9883.110.7254
Output of DF46.1867.860.7141
Output of SFY28.6541.590.6446
Output of WJD55.3878.980.6639
Output of GPT116.66182.730.6128
Output of SL41.8667.310.7769
Output of ST38.5259.120.9178
Real-time power2.573.760.5831