Research Article
Long-Term Optimal Operation of the Cascade Hydro-Wind-Photovoltaic Hybrid System considering Transmission Section Constraints
Table 8
Error analysis index values for simulation scheduling results.
| Items | MAE | RMSE | MAPE | R2 |
| Capacity of HJD | 12751.88 | 16843.51 | 3.94% | 0.9623 | Capacity of DF | 1310.26 | 2754.83 | 2.64% | 0.9818 | Capacity of WJD | 3333.37 | 6753.97 | 2.05% | 0.9658 | Capacity of GPT | 4693.14 | 13994.89 | 0.94% | 0.5086 | Output of HJD | 51.98 | 83.11 | — | 0.7254 | Output of DF | 46.18 | 67.86 | — | 0.7141 | Output of SFY | 28.65 | 41.59 | — | 0.6446 | Output of WJD | 55.38 | 78.98 | — | 0.6639 | Output of GPT | 116.66 | 182.73 | — | 0.6128 | Output of SL | 41.86 | 67.31 | — | 0.7769 | Output of ST | 38.52 | 59.12 | — | 0.9178 | Real-time power | 2.57 | 3.76 | — | 0.5831 |
|
|