Research Article

A Case Study of Tunnel Reinforcement Measure during Traffic Upgrading in Chongqing City, China

Figure 10

Tunnel displacements for two main construction phases when SASTCT measure was used: (a) vertical displacement for the first phase, (b) vertical displacement for the second phase, and (c) horizontal displacement for the second construction phase.
(a)
(b)
(c)