Research Article
A Case Study of Tunnel Reinforcement Measure during Traffic Upgrading in Chongqing City, China
Figure 8
Two main phases of subsequent construction procedures: (a) construction of the flyover and (b) excavation of the surrounding rock on the southern side of the tunnel.
(a) |
(b) |