Flexible Temporary Shield in Soft and Sensitive Clay: 3D FE Modelling of Experimental Field Test
Table 5
Construction sequence of FE modelling in PLAXIS-3D.
| Phase | In the model | Drainage |
| Phase 0 | Only soil elements (no structure) | procedure | Phase 1 | Excavation (1st layer, depth: 0.6 m) fissured brown clay | Drained | Phase 2 | Excavation (2nd layer: 0.6 to 2 m) brow clay | Plastic: undrained (soil model) | Phase 3 | Adding structural element | Plastic: undrained (soil model) | Phase 4 | Excavation (3rd layer: 2 m to 6 m) sensitive blue clay | Plastic: undrained (soil model) |
|
|
Note: the definition of undrained is discussed in construction step 2: phase 2. |