Research Article

Soil-Structure Interaction of Flexible Temporary Trench Box: Parametric Studies Using 3D FE Modelling

Figure 6

PLAXIS-3D simulation of the construction steps.
(a) Step 0 (initial phase)
(b) Step 1 (Phase 1)
(c) Step 2 (Phase 2)
(d) Step3 (Phase 3)
(e) Step 4 (Phase 4)