Research Article
Self-Tuning Inference Model for Settlement in Shield Tunneling: A Case Study of the Taipei Mass Rapid Transit System’s Songshan Line
Table 1
Descriptions of factors in the dataset.
| Variable | Factor | Type | Description |
| | Shear strength of soils | Input | The strength of the soil and its resistance to deformation | | Groundwater level | Input | The level at which the soil is saturated | | Depth of tunnel center line | Input | The distance between the tunnel center line and the soil surface | | Tunneling distance | Input | The distance of the segmental joint set in the shield tunnel | | Chamber pressure | Input | The pressure applied to counterbalance the lateral earth | | Total thrust force | Input | A reactive force exerted on the shield tunneling | | Tunneling speed | Input | The speed of the cutting head on total torque | | Backfill quantity | Input | Amount of material diffused behind the segmental lining | | Quantity of excavated soil | Input | Amount of soil excavated during the tunneling process | | Water pressure | Input | The pressure of the water distributed on the tunnel wall | | Settlement | Output | Subsidence due to tunneling activity |
|
|