Research Article
Self-Tuning Inference Model for Settlement in Shield Tunneling: A Case Study of the Taipei Mass Rapid Transit System’s Songshan Line
| Position of tunnel surface and monitoring section | Monitoring instrument | Monitoring frequency |
| | Subsidence observation points (SB, SM, and SSI) | d1 > 50 m | Initial value measurement | Multipoint borehole extensometer (EXM) | d1 ≤ 25 m | Every 5 m | Inclinometer (TI) |
| | Crack meter (CG and CM) | d2 ≤ 25 m | Once every 5 m. At least once a day for 3 consecutive days since crossing the observation surface | Water level observation well and piezometer (OW and PZS) | d2 > 25 m | Once a week | Soil inclination pipe (SIS) |
|
|