Research Article

Self-Tuning Inference Model for Settlement in Shield Tunneling: A Case Study of the Taipei Mass Rapid Transit System’s Songshan Line

Table 4

Shield monitoring dataset.

Shear strength of soilGroundwater levelTunneling distanceChamber pressureTotal thrust forceTunneling speedBackfill quantityWater pressureSettlement

598.5252.0442.2941013144049.45−4.45
598.7981.42.34510276360.6648.9−6.3
598.6180.9642.54910958352.1247.91−10.19
999.0831.0092.2891448202.1215.49−29.73
1099.11.0092.39613956202.0819.71−30.52