Research Article
Gap between Prediction and Truth: A Case Study of False-Positives in Leakage Detection
Figure 5
Time cost of the 2nd-order -test vs. 2nd-order -test. The solid line is the time cost of the -test, and the dashed line is the time cost of the -test. (a) . (b) .
(a) |
(b) |