Research Article

Gap between Prediction and Truth: A Case Study of False-Positives in Leakage Detection

Figure 5

Time cost of the 2nd-order -test vs. 2nd-order -test. The solid line is the time cost of the -test, and the dashed line is the time cost of the -test. (a) . (b) .
(a)
(b)