Research Article

[Retracted] Distribution Network Grid Planning and Automatic Routing Based on Cluster Analysis Algorithm

Table 2

Classification of grid construction standards.

Grid standardSupply area classificationLoad/MWRecommended typical wiring patternsReliability rate target (RS-3)

T1General areas (A+, A and B cores)32,16–48Double ring network, “N-1”≥99.999%
Channel tight (A+, A and B cores)24,16–24Two for one spare, three for one spare≥99.999%
High-capacity user-intensive (A+, A, and B cores)32,8–48Double direct supply opening and closing≥99.999%

T2Class B non-core32,16–48Segment moderate contact, “N-1”≥99.965%
T3Class C and belowAs the case may beMultisegment moderate contact, “N-1,” single radiation≥99.897% (class C)
≥99.828% (class D)

T4Unable to oil pot due to user influenceAs the case may beAs the case may beDepends on user needs