Research Article
[Retracted] Study on Control of Risks Existing in the Construction of Information Management System in Public Hospitals
Table 11
Judgment matrix A5 in the indicator level.
| A5 Technical risk | A51 Technical disclosure execution risk is not in place | A52 Failure risk of new technology application | A53 Risk of non-standard operation by technical personnel |
| A51 Technical disclosure execution risk is not in place | 1 | 1/4 | 1/3 | A52 Failure risk of new technology application | 2 | 1 | 6 | A53 Risk of non-standard operation by technical personnel | 3 | 1/6 | 1 |
|
|