[Retracted] Study on Control of Risks Existing in the Construction of Information Management System in Public Hospitals

Table 15

Calculation results of integrated weight values of indicators in the indicator layer.

Standard layerIndicator layer
CodeRisk factorsRelative weight valueCodeRisk factorsRelative weight valueCombined weight value

A1Organizational management risk0.1398A11Risk of insufficient organizational execution0.16380.0229
A12Risk of inadequate system operation capability of personnel0.14880.0208
A13Improper system operation and maintenance risks0.32720.0458
A14Risk of inadequate organization of personnel0.36190.0606
A2The cost of risk0.1569A21Lack of awareness of cost control risks0.16220.0254
A22Hardware loss exceeds expected risk0.42440.0665
A23Equipment and facilities price rise risk0.27060.0425
A24Unreasonable risk of capital allocation0.14560.0229
A3System operation risk0.2114A31System design failure risk0.09920.0188
A32The system function cannot meet the risk of hospital demand0.30560.0656
A33Network hardware failure risks0.20180.0428
A34Core network system operation risks0.16820.0366
A35System operation instability risk0.08820.0465
A36Hardware network security risks0.16020.0339
A4Schedule risk0.0862A41Hospital application needs to change the risk0.14750.0138
A42Risk of uncorrected progress0.19480.0172
A43Risk of delivery delay0.23050.0299
A44Risk of schedule delay due to rework0.42960.0375
A5Technical risk0.1398A51Technical disclosure execution risk is not in place0.16590.0526
A52Failure risk of new technology application0.49560.0688
A53Risk of non-standard operation by technical personnel0.31090.0452
A6Security risks0.2664A61Risk of system security failure0.15450.0978
A62Database backup risks0.08960.0236
A63Equipment room security risks0.36450.0978
A64User rights are incorrectly configured0.25480.0748
A65Network security management software upgrade risk0.14580.0452