Research Article

[Retracted] Study on Control of Risks Existing in the Construction of Information Management System in Public Hospitals

Table 2

Summary of the results of the questionnaire Survey.

Name of the riskTinySmallerGeneralLargerGreat

Risk of insufficient organizational execution0015105
Risk of inadequate system operation capability of personnel0002010
Improper system operation and maintenance risks0012162
Risk of inadequate organization of personnel0015105
Lack of awareness of cost control risks00101010
Hardware loss exceeds expected risk0016104
Equipment and facilities price rise risk001028
Unreasonable risk of capital allocation008814
System design failure risk005520
The system function cannot meet the risk of hospital demand00101010
Network hardware failure risks0010128
Core network system operation risks0010515
System operation instability risk0051015
Hardware network security risks00101010
Hospital application needs to change the risk00101010
Risk of uncorrected progress0012108
Risk of delivery delay0015105
Risk of schedule delay due to rework00101010
Technical disclosure execution risk is not in place008814
Failure risk of new technology application006618
Risk of non-standard operation by technical personnel0051015
Risk of system security failure00101010
Database backup risks0012162
Equipment room security risks0012126
User rights are incorrectly configured0051510
Network security management software upgrade risk0012108