[Retracted] Study on Control of Risks Existing in the Construction of Information Management System in Public Hospitals
Table 9
Judgment matrix A3 in the indicator level.
| A3 System operation risk | A31 System design failure risk | A32 The system function cannot meet the risk of hospital demand | A33 Network hardware failure risks | A34 Core network system operation risks | A35 System operation instability risk | A36 Hardware network security risks |
| A31 System design failure risk | 1 | 1/3 | 1/4 | 1/5 | 1/5 | 1/4 | A32 The system function cannot meet the risk of hospital demand | 3 | 1 | 2 | 3 | 4 | 3 | A33 Network hardware failure risks | 4 | 1/2 | 1 | 1/2 | 3 | 5 | A34 Core network system operation risks | 3 | 1/3 | 2 | 1 | 3 | 1/2 | A35 System operation instability risk | 5 | 1/4 | 1/3 | 1/3 | 1 | 1/4 | A36 Hardware network security risks | 4 | 1/3 | 1/5 | 2 | 4 | 1 |
|
|