Research Article
Development of Multiple Big Data Analytics Platforms with Rapid Response
Table 9
Designated data size and its priority in Case
.
| Sequence | Priority | Data size | Data theme | Code name |
| 1 | 4 | 10 G | World-famous masterpiece | WC | 2 | 1 | 250 G | Load of production machine: Overlaoding | OD | 3 | 2 | 250 G | Load of production machine: Underloading | UD | 4 | 3 | 1 T | Qualified rate of semiconductor products | YR | 5 | 1 | 750 G | Correlation among temperature and people’s power utilization | TE | 6 | 4 | 750 G | Correlation among rainfall and people’s power utilization | RE | 7 | 1 | 100 G | Flight information in the airport | AP | 8 | 5 | 500 G | Traffic violation/accidents | TA |
|
|