Research Article
[Retracted] An Effective Hybrid Multiobjective Flexible Job Shop Scheduling Problem Based on Improved Genetic Algorithm
Table 4
Wire harness product processing production data.
| Operation sequence | Process name | Optional equipment | Corresponding processing time/(min time) |
| 1 | Offline | | 0.03,0.05 | 2 | Crimping | | 0.02,0.03 | 3 | Inline | | 0.06,0.08 | 4 | REPACK | | 0.04,0.05 |
|
|