Research Article
Metro Engineering Project Schedule Optimization Based on Wireless Network Communication and BIM Model Algorithm
| ā | Engineering | Unit | Quantity |
| Earthwork engineering | Excavation | m3 | 612977 | Fill | 835820 | Desilt | 698211 | Subgrade earthwork | 931880 |
| Foundation treatment engineering | Precast concrete pipe pile | m | 105523 | Track jet grouting pile | 138480 |
| Track engineering | Track laying | km | 7.9 | Lay a railway track | Group | 28 | Integral track bed | m3 | 964 | Gravel track bed | m3 | 12869 |
| ā | Dynamic lighting | m2 | 156800 | Fire-fighting | Drainage | Ventilation works |
|
|