Research Article
Substation Equipment Temperature Prediction Method considering Local Spatiotemporal Relationship
Table 1
Summary of names for the equipment temperature monitoring key points.
| | Serial number | Equipment name |
| | 1 | 1–10 heat sinks at 220 side | | 2 | 19–23 heat sinks at 110 side | | 3 | 13–17 heat sinks at 110 side | | 4 | 110 side conservator | | 5 | 110 kV bushing phase C contact | | 6 | 110 kV bushing phase B contact | | 7 | 110 kV bushing phase A contact | | 8 | 220 kV bushing phase C contact | | 9 | 220 kV bushing phase B contact | | 10 | 220 kV bushing phase A contact | | 11 | 110 side equipment panorama | | 12 | 220 side equipment panorama |
|
|