Research Article
An Improved Stacking Model for Equipment Spare Parts Demand Forecasting Based on Scenario Analysis
Table 2
Analysis of equipment operation and support scenarios based on the 5W1H method.
| 5W1H Scenarios | Who | When | Where | Why | What | How |
| Spare Part Attributes | Variety | Failure Time - Year | | | | | Number of Single Machine Installations | Importance | Failure Time - Month | | | | | Loss Sensitivity | Price |
| Operation Scenario | Super Pilot | Average Temperature | Maximum flight Altitude | Tough/Special Tasks | Subject 1 flight hours | Flight days | First-Grade Pilot | Average flight Altitude | Subject 2 flight hours | Flight hours | Second-Grade Pilot | Average Humidity | Plain flight hours | General/Daily Tasks | Subject 3 flight hours | Takeoff and Landing Times | Third-Grade Pilot | Bad flight Days | Plateau flight hours | Subject 4 flight hours | Sorties Rate |
| Support Scenario | Maintenance Personnel Occupancy Rate | Mean Time to Repair | Outfield Repair Rate | Repair Rate | | On-Site Rate of Maintenance Equipment | Lead Time |
|
|