Research Article
Thermal Hydraulic Analysis Using GIS on Application of HTR to Thermal Recovery of Heavy Oil Reservoirs
Table 2
Basic configuration of injection.
| | | Injection with boiler/HTR-PM |
| | Number of used boiler/HTR-PM reactor at same time | 15/1 | | Number of injected wells at same time | 30 (20–40) | | Number of boilers | 100 | | Number of wells | 6000 | | Initial temperature of steam (°C) | 318.05/566 | | Mass flow out of each boiler/HTR-PM (ton/day) | 200–800/6500 | | Mass flow rate of water to each well (ton/day) | Around 200 | | Initial pressure of steam (MPa) | 11/14.3 | | Initial dryness of steam | 0.725/1 | | Average length of main steam pipeline (km) | 0/7.5 | | Area of reference oil field (km2) | | | Average length of branch steam pipeline (km) | 0.8 | | Average distance from injection station to well head | 0.2 | | Depth of typical well (m) | 759.75 |
|
|