Research Article
Nuclear Power Plant Maintenance Optimization with Heuristic Algorithm
Table 8
Obtained optimal test placement times for case scenario 2 with consideration of the
.
| No. | Basic event | TP (hr) |
| 1 | AFW-TDP-FR-2P6HR | 406.90 | 2 | AFW-MDP-FR-3A6HR | 173.51 | 3 | AFW-MDP-FR-3B6HR | 414.82 | 4 | AFW-CKV-OO-CV142 | 2092.56 | 5 | AFW-CKV-OO-CV172 | 1990.92 | 6 | AFW-CKV-OO-CV157 | 2200.46 | 7 | ACP-BAC-ST-4KV1H | 1029.01 | 8 | ACP-BAC-ST-4KV1J | 1370.32 | 9 | DCP-BDC-ST-BUS1A | 1524.41 | 10 | DCP-BDC-ST-BUS1B | 1179.81 |
| (hr) | 2212.56 | SET (hr) | 1892.51 | | |
|
|