Research Article
Study of the Reactor Control System of MSHIM in AP1000
Figure 9
The 5% FP/min ramp load decrease simulation results obtained with the improved MSHIM control strategy: (a) desired and real nuclear powers (% FP), (b) AO (%), (c) M-bank position (Step), and (d) AO-bank position (Step) (the prefixes “ORI-” and “MOD-” denote the “original” and “modified,” resp.).
(a) |
(b) |
(c) |
(d) |