Research Article

Study of the Reactor Control System of MSHIM in AP1000

Table 3

Five performance indices from the 10% FP step load decrease simulation of the original and modified power control system in MSHIM.

Performance indicesM-StepsAO-Steps

Original 257.043.021.15901527
Modified 113.703.201.15711717