Research Article

Simulation and Analysis of Small Break LOCA for AP1000 Using RELAP5-MV and Its Comparison with NOTRUMP Code

Table 3

Sequence of events during 10-inch SBLOCA in AP1000 by RELAP5-MV and NOTRUMP.

EventREALP5-MVNOTRUMP [7]RELAP5 [5]

Break opens00.000.000.0
Reactor trip signal5.55.24.7
ā€œSā€ signal8.06.46.5
Main feed isolation valves begin to close8.28.47.9
Steam turbine stop valves close9.811.211.4
Reactor coolant pumps start to coast down1212.412.5
Accumulator injection starts9485.0106.6
Accumulator-1 empties440418.2385.4
Accumulator-2 empties442425.5390.0
ADS stage 1732750.0728.8
ADS stage 2802820.0798.8
ADS stage 3922940.0918.8
ADS stage 411811491.041284