Research Article
Strategy Evaluation for Cavity Flooding during an ESBO Initiated Severe Accident
Figure 7
Effect of intentional depressurization timing.
| (a) Pressure of the primary system |
| (b) Water level of the primary system |
| (c) Temperature of core exit |
| (d) Corium in the lower head |
| (e) Corium in containment |
| (f) Containment pressure |
| (g) Water level of the cavity |
| (h) Hydrogen in containment |