Research Article
RELAP5 Foresight Thermal-Hydraulic Analysis of Hypothesis Passive Safety Injection System under LOCA for an Existing NPP in China
Table 3
10-inch SBLOCA transient sequence of the accident.
| | Event | Time (s) |
| | Break occurs | 0.0 | | Reactor trip signal | 2.0 | | āSā signal | 3.0 | | RCPs begin to coast down | 8.0 | | ACC injection begins | 62.0 | | ACC-1 empties | 350.0 | | ACC-2 empties | 350.0 | | ADS stage 1 | 524.0 | | ADS stage 2 | 882.0 | | CMT-1 empties | 1112.0 | | CMT-2 empties | 1374.0 | | HET injection begins | 882.0 |
|
|