Research Article

Design Change and Operational Consideration of the HVAC System during Nuclear Power Plant Decommissioning

Table 3

HVAC operation strategies for decommissioning.

SystemTransition periodDecommissioning phase

RCB HVAC and purgeNatural ventilation, intermittent purge (with recirculation operation using 2 RCFCs and recirculation fans)Recirculation operation, entire ventilation operation (continuous or intermittent purge), partial ventilation operation (portable temporary HVAC units)
FHB HVACNormal operation (same as normal operating NPP)—
MCR HVACContinuously forced ventilation (using supply and exhaust fan without recirculating flow), natural ventilation, temporary HVAC unit operation—