Research Article
Distribution of Side Abutment Stress in Roadway Subjected to Dynamic Pressure and Its Engineering Application
Figure 3
Measured curve of the distribution of the side abutment stress in Qianyingzi mine. In the figure: represents the horizontal distance of the borehole stress-meter to the gob, respectively; the initial pressure of the borehole stress-meter is 4.0 MPa.