Research Article
Simultaneous Measurements of the Vehicle, Track, and Soil Vibrations at a Surface, Bridge, and Tunnel Railway Line
Figure 15
Vibration of the bridge and time records of the particle velocities of the 1/3 point due to the train passage with (a) 100 km/h and (b) 160 km/h.
(a) |
(b) |