Research Article
Study on Regular Inspection Frequency of Bridge Based on Seismic Vulnerability Analysis
Table 4
Preferred repair strategies and repair percentages for the pier.
| Repair strategies | The repair percentages by damage state (%) | Slight | Moderate | Major | Complete |
| No action | 20 | 0 | 0 | 0 | Repair with epoxy mortar | 45 | 5 | 0 | 0 | Repair with epoxy fine stone concrete | 20 | 23 | 0 | 0 | Replacement of concrete protection layer | 5 | 9 | 0 | 0 | Pasting steel plate | 5 | 18 | 0 | 0 | Pasting carbon fiber cloth | 5 | 18 | 0 | 0 | Replace column | 0 | 22 | 72 | 0 | Wrap with reinforced concrete | 0 | 5 | 20 | 0 | Demolish and replace bridge | 0 | 0 | 8 | 100 |
|
|