Research Article
Experimental Study on Track-Bridge Interactions for Direct Fixation Track on Long-Span Railway Bridge
Figure 4
Examples of measured data: (a) wheel load (AREX); (b) wheel load (KTX); (c) rail displacement (AREX); (d) rail displacement (KTX); (e) track girder displacement (AREX); (f) track girder displacement (KTX). Measurement results of a direct fixation track on a bridge according to train speeds: (g) wheel load; (h) rail displacement; (i) track girder displacement.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |
(i) |