Research Article

The Stability Evaluation of Shaft during Drastic Drawdown Dewatering of Alluvium

Table 6

Training sample of shaft stability.

Shaft namex1 (mm·a−1)x2 (mm)x3 (m)x4 (m)x5 (m)x6x7Shaft stateDiscriminant value y

Auxiliary shaft in the Linhuan mine474262407.20.7710Failure57.243
Main shaft in the Haizi mine605032476.50.811Failure59.287
Auxiliary shaft in the Haizi mine605032477.20.7110Failure57.643
Auxiliary shaft in the Luling mine504002006.11.2510Failure54.436
Main shaft in the Zhangshuanglou mine384662425.50.8311Failure56.309
Auxiliary shaft in the Zhangshuanglou mine384662425.5111Failure57.405
Main shaft in the Tongting mine303062305.32.200Failure58.181
Auxiliary shaft in the Tongting mine303062306.551.6700Failure56.037
Ventilation shaft in the Tongting mine303062305.01.1110Failure56.442
Main shaft in the Dongtan mine15.7353.3108.1770.9111Stable33.970
North ventilation shaft in the Dongtan mine9.14186.6111.0461.2511Stable37.370