Research Article

Study on Presplitting Blasting the Roof Strata of Adjacent Roadway to Control Roadway Deformation

Figure 13

The presplitting blasting borehole spacing of (a) 400 mm, (b) 500 mm, and (c) 600 mm.
(a)
(b)
(c)