Research Article

High-Speed Train-Track-Bridge Dynamic Interaction considering Wheel-Rail Contact Nonlinearity due to Wheel Hollow Wear

Figure 20

Time histories of displacement at the midsection of the main span (speed:  = 350 km/h): (a) vertical; (b) lateral.
(a)
(b)