Research Article

High-Speed Train-Track-Bridge Dynamic Interaction considering Wheel-Rail Contact Nonlinearity due to Wheel Hollow Wear

Figure 24

Time histories of lateral acceleration at the midsection of the main span (speed:  = 350 km/h).